The Investigation of Energy Risk in Pre-Construction Stage: A Qualitative Approach

Authors

  • Mohammad Syabilee Nikman Lee Department of Construction Management, Faculty of Technology Management and Business, Universiti Tun Hussein Onn Malaysia, Parit Raja, Johor, Malaysia
  • Sulzakimin Mohamed
  • Roshartini Omar
  • Norliana Sarpin
  • Haryati Shafii
  • Adejoh Ahmodu Adaji Department of Building Technology, Kogi State Polytechnic, Lokoja, Nigeria
  • Muhamad Azahar Abas Department of Natural Resources and Sustainability, Faculty of Earth Science, Universiti Malaysia Kelantan, Jeli, Kelantan, Malaysia

DOI:

https://doi.org/10.11113/intrest.v15nS1.115

Keywords:

Retrofit, existing building, retrofit risk, energy risk

Abstract

The energy demand growth every year for existing building due to the natural lifecycle of the building performance. Systematic strategy in retrofitting is proven to revamp the energy building performance. However, the retrofitting process is facing several of unknown risk as early in pre-construction stage to achieve optimum energy efficiency design strategy. The risk requires strategic assessment to minimize the impact towards the efficiency level in retrofitting. This study aims to examine the risks and the potential impact towards design strategies by conducting a semi-structured interview from six internal stakeholders in the retrofit project. The result derived from the interview revealed that there are 13 of major risks involve in retrofit project and divided into planning stage and design stage. All the risks are proven to provide a potential impact towards energy efficiency design strategies.

Author Biographies

Sulzakimin Mohamed

Department of Construction Management, Faculty of Technology Management and Business, Universiti Tun Hussein Onn Malaysia, Parit Raja, Johor, Malaysia

Centre of Sustainable Infrastructure and Environmental Management, Faculty of Technology Management and Business, Universiti Tun Hussein Onn Malaysia, Parit Raja, Johor, Malaysia

Roshartini Omar

Department of Construction Management, Faculty of Technology Management and Business, Universiti Tun Hussein Onn Malaysia, Parit Raja, Johor, Malaysia

Centre of Sustainable Infrastructure and Environmental Management, Faculty of Technology Management and Business, Universiti Tun Hussein Onn Malaysia, Parit Raja, Johor, Malaysia

Norliana Sarpin

Department of Construction Management, Faculty of Technology Management and Business, Universiti Tun Hussein Onn Malaysia, Parit Raja, Johor, Malaysia

Centre of Sustainable Infrastructure and Environmental Management, Faculty of Technology Management and Business, Universiti Tun Hussein Onn Malaysia, Parit Raja, Johor, Malaysia

Haryati Shafii

Department of Construction Management, Faculty of Technology Management and Business, Universiti Tun Hussein Onn Malaysia, Parit Raja, Johor, Malaysia

Centre of Sustainable Infrastructure and Environmental Management, Faculty of Technology Management and Business, Universiti Tun Hussein Onn Malaysia, Parit Raja, Johor, Malaysia

Downloads

Published

2021-11-30

How to Cite

Nikman Lee, M. S., Mohamed, S., Omar, R., Sarpin, N., Shafii, H., Adaji, A. A., & Abas, M. A. (2021). The Investigation of Energy Risk in Pre-Construction Stage: A Qualitative Approach. International Journal of Real Estate Studies, 15(S1), 39–45. https://doi.org/10.11113/intrest.v15nS1.115