Risk Analysis in the Implementation of Flood Control Construction Projects in Jambi Province

Authors

  • Dian Febrianty Universita Bung Hatta

DOI:

https://doi.org/10.11113/intrest.v19n2.430

Keywords:

Construction Risk, Flood Control, Project Management, Jambi Province, Risk Analysis

Abstract

Flood control construction projects are highly prone to various risks due to technical, environmental, and management factors. While risk management in general construction projects is widely studied, few works focus specifically on flood control infrastructure in flood-prone regions. This study aims to analyze the risks that arise in the implementation of flood control construction projects in Jambi Province. A mixed-methods approach was employed, combining survey data from key stakeholders with quantitative analysis using severity indices and probability-impact matrices and formulate mitigation strategies using the PDCA (Plan – Do – Check – Act) approach. Data were collected through questionnaires distributed to stakeholders and analyzed using risk matrices The results showed that among 39 identified risk variables, one was categorized as moderate-risk, and thirtyeight were categorized as low – risk. Key risks include delays in land acquisition, design changes, weather disruptions, and material shortages. Mitigation strategies include enhanced planning, improved stakeholder communication, and strengthening contractor capabilities. The study contributes theoretically by demonstrating the applicability of PDCA in risk management for flood – prone infrastructure, and practically by providing actionable strategies to enhance project resilience in similar contexts globally. These findings aim to assist practitioners in recognizing and managing key risks to ensure successful project delivery.

References

Amalia, S. N. & Khamim, M. (2022). Risk Analysis of Bagong Dam Project Package Ii Trenggalek Regency with Failure Mode and Effect Analysis (FMEA) Method. Online Journal of Construction Engineering Management Thesis (JOS-MRK), 3(4), 92-98.

Chan, H. K. & Wang, X. (2013). Risk assessment. In Fuzzy Hierarchical Model for Risk Assessment: Principles, Concepts, and Practical Applications (pp. 7-23). London: Springer London.

Chen, W., Liu, J., & Zhang, X. (2016). Risk mitigation in large infrastructure projects: Applying PDCA cycle. Journal of Construction Engineering and Management, 142(9), 04016035.

Deming, W. E. (1986). Out of the Crisis. MIT Press.

Dewi, A. I. & Nurcahyo, C. B. (2013). Risk Analysis in the Underpass Construction Project at the Dewa Ruci Kuta Bali Intersection (Doctoral dissertation). Sepuluh Nopember Institute of Technology).

Duffield, C. & Trigunarsyah, B. (1999). Project Management Conception to Completion (Australia: Engineering Education Australia).

Ervianto, W. I. (2005). Construction Project Management. Andi Publisher.

Fahlevi, A. E., Safaria, F., & Susetyaningsih, A. (2019). Risk Management Analysis of Construction Project Implementation (Case Study of Thee Matic Mall and Hotel Majalaya, Bandung Regency). Journal of Construction, 17(1), 28-36.

Fatchiyati, A. (2019). Risk Management Analysis of the Construction of the West Flood Canal Motion Weir in Semarang City and its Impact on the Environment.

Gustavson, S. G. & Trieschmann, J. S. (1995). The pension maximization strategy. Journal of Financial Service Professionals, 49(2), 73.

Hair Jr, J. F., Black, W. C., Babin, B. J., & Anderson, R. E. (2010). Multivariate data analysis. In Multivariate data analysis (pp. 785-785).

Jambi Provincial Statistics Agency. (2022). Jambi Province in Figures 2022.

Loosemore, M., Raftery, J., Reilly, C., & Higgon, D. (2012). Risk management in projects. Routledge.

Ministry of Public Works and Housing (MoPW). 2019. Infrastructure Project Risk Management Guidelines. Jakarta: Ministry of PUPR.

Molina Azorin, J. F. (2012). Mixed methods research in strategic management: Impact and applications. Organizational research methods, 15(1), 33-56.

Project Management Institute. (2017). A Guide to the Project Management Body of Knowledge (PMBOK Guide) (7th Ed.). Project Management Institute.

Pertiwi, C. K. & Anggraeni, I. A. A. (2024). Analisis Risiko Mutu Pelaksanaan Konstruksi Bendungan Leuwikeris Pekerjaan Paket 1. Jurnal Ilmiah Desain & Konstruksi, 22(2), 151-167.

Saputro, C. D. (2022). Risk management analysis of multi-storey building projects with severity index method. Journal of Civil Engineering Building and Transportation, 6(2), 140-147.

Siahaan, M., Suharman, H., Fitrijanti, T., & Umar, H. (2024). When internal organizational factors improve detecting corruption in state-owned companies. Journal of Financial Crime, 31(2), 376-407.

Sofandi, P. S. (2017). Risk Management in Building Construction Projects in Yogyakarta Using the House of Risk Method (Doctoral dissertation). UAJY.

Sugiyono. (2013). Metode Penelitian Pendidikan (Pendekatan Kuantitatif, Kualitatif dan R&D). Alfabeta: Bandung.

Smith, N. J., Merna, T., & Jobling, P. (2014). Managing risk in construction projects. John Wiley & Sons.

Wideman, R. M. (2004). A management framework: For project, program and portfolio integration. Trafford Publishing.

Xie, J., Zhao, X., & Zhang, L. (2021). Supply Chain Risk Management in Construction Projects. Engineering, Construction and Architectural Management, 28(9), 2563–2582.

Yuliana, N. P. I. & Rani, N. M. S. (2020). Risk analysis of the implementation of the Tukad Sungi flood control infrastructure development project which affects cost and time performance. Jurnal Ilmiah MITSU (Media Informasi Teknik Sipil Universitas Wiraraja), 8(2), 77-88.

Downloads

Published

2025-12-31

How to Cite

Dian Febrianty. (2025). Risk Analysis in the Implementation of Flood Control Construction Projects in Jambi Province. International Journal of Real Estate Studies, 19(2), 49–62. https://doi.org/10.11113/intrest.v19n2.430

Issue

Section

Articles

Similar Articles

<< < 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 > >> 

You may also start an advanced similarity search for this article.